Vigilance Outlook  Last refresh :


Limit Alert level Side of the limit management Small impact works
(GWh 25°C)
Interruption of sales and interruptible/UIOLI Locational spread Mutualized restriction
NS1
check_circle
Upstream
NS2
check_circle
 
Downstream
30
NS3
check_circle
 
Downstream
30
NS4
check_circle
 
Upstream
30
EO2
check_circle
Downstream
30
S1
check_circle
Downstream
30
SN1
check_circle
Upstream
SN3
check_circle
 
Downstream


Limit Alert level Side of the limit management Small impact works
(GWh 25°C)
NS1
check_circle
Upstream
NS2
check_circle
 
Downstream
30
NS3
check_circle
 
Downstream
30
NS4
check_circle
 
Upstream
30
EO2
check_circle
Downstream
30
S1
check_circle
Downstream
30
SN1
check_circle
Upstream
SN3
check_circle
 
Downstream


30/03/2024 31/03/2024 01/04/2024 02/04/2024
Limit Alert level Alert level Alert level Alert level
NS1
check_circle
check_circle
No data to show
No data to show
NS2
check_circle
construction
check_circle
construction
No data to show
No data to show
NS3
check_circle
construction
check_circle
construction
No data to show
No data to show
NS4
check_circle
construction
check_circle
construction
No data to show
No data to show
EO2
check_circle
construction
check_circle
construction
No data to show
No data to show
S1
check_circle
construction
check_circle
construction
No data to show
No data to show
SN1
check_circle
check_circle
No data to show
No data to show
SN3
check_circle
check_circle
No data to show
No data to show

 * D+5 data publication starts on D-5 3.30pm.

Map of the
North▸South and East▸West limits

Map of the
South▸North limits

      Winter storage monitoring
      Good stock level downstream of the network limits
      Gas deficit in the storage facilities downstream of the network limits
    Comment :
      Updated on :
    circle_notificationsEnd-of-day imbalance
    GRTgaz: -32.06 Short
    circle_notifications SEC projected
    GRTgaz: 2 727,981 Short balanced

     

    Interruption of sales and interruptible/UIOLI :
    Curtailment of interruptible transport capacities (including backhaul and UIOLI) and stop of capacity trading on the points/direction which stress the limit.

    Locational spread :
    Call to the market on the gas stock exchange, with a twofold locational product: the TSOs buy gas downstream of the limit and sell it simultaneously upstream of the limit.

    Mutualized restriction :
    Partial restriction of firm capacities, pro-rata to the subscribed capacities, mutualized on a superpoint. Only on the side of the limit's management.

    Winter storage monitoring :
    Indicator for monitoring the filling level of storage facilities located downstream of the network limits. The purpose is to verify the availability in the medium term of a sufficient stock to ensure that congestion management mechanisms are effective if activated.